
Homesite 84: Santa Maria Grande Elevation 3 with Option 1 (master bedroom coffered ceiling), Option 2 (master bedroom 2880 French door in lieu of 26 single hung window), Option 11 (second floor bath #4 @ bedroom 4 with playroom), Option 20 (garage 2' front extension), Option 50 (super kitchen).
Construction status: Drywall starts this week.

Construction status: Rough trades

Construction status: Metalframing starts May 8th.
Call Leona, Jen or Terry at 407.977.4445 for more information.
Call Leona, Jen or Terry at 407.977.4445 for more information.